The BulrushesThe Bulrushes
  • Home
  • News
    • General
    • Politics
    • World
  • APO Releases
  • Business
  • Sport
    • Athletics
    • Basketball
    • Boxing
    • Cricket
    • Football
    • Rugby
    • Netball
    • Swimming
    • Tennis
  • Entertainment
  • Bookmarks
Search
  • Crime
  • Health
  • Lifestyle
  • Science
  • Weird World
  • Company Profile
  • Contact Us
  • Privacy Policy
Copyright © 2026 The Bulrushes
Reading: Eskom’s Load-Shedding Puts Strain On City Power, More Than 2 000 Faults
Share
Notification Show More
Font ResizerAa
The BulrushesThe Bulrushes
Font ResizerAa
Search
  • Home
  • SA National Elections 2024
  • News
    • General
    • Politics
    • World
  • Sport
    • Athletics
    • Basketball
    • Boxing
    • Cricket
    • Football
    • Netball
    • Rugby
    • Swimming
    • Tennis
  • Bookmarks
    • Customize Interests
    • My Bookmarks
  • The Bulrushes
    • Company Profile
    • Contact Us
    • Privacy Policy
Follow US
Copyright © 2026 The Bulrushes
The Bulrushes > featured > Eskom’s Load-Shedding Puts Strain On City Power, More Than 2 000 Faults
featuredNews

Eskom’s Load-Shedding Puts Strain On City Power, More Than 2 000 Faults

Staff Writer
Staff Writer
Published: May 5, 2022
Share
2 Min Read
TAKING STRAIN: Isaac Mangena, City Power spokesperson, said more than 2 000 outages were reported in Johannesburg Thursday morning
SHARE

City Power on Thursday said Eskom’s ongoing load-shedding was putting a strain on its resources and hampering its ability to timeously attend to faults.

Many of the faults in Johannesburg have been blamed on switching the power system on and off.

“From this morning we have been dealing with many outages, over 2000, in different areas that are as a result of load-shedding,” said City Power Spokesperson Isaac Mangena.

“Most of the localised faults seen during load-shedding are due to vandalism and theft which happens during the downtime when the network is off.”

He said during load-shedding criminals take advantage and tamper with the infrastructure leading to post-load-shedding outages.

“The impact of load-shedding is putting a strain on City Power network and resources, and affect our response to outages and ability to conduct maintenance,” said Mangena.

“The announcement this week by Eskom for the implementation of Stage 2 load-shedding comes as we were still trying to recover from the previous load-shedding, coupled by inclement weather.”

Earlier this week Eskom said it expects Stage 2 load-shedding to continue till Friday.

Mangena said during load-shedding City Power is not able to do planned maintenance “for safety reasons and because of stretched resources”.

He added: “We urge our customers to bear with us as we deal with the backlogs effects of the load-shedding.”

Support The Bulrushes PayPal Logo
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Email Copy Link
Share
What do you think?
Love0
Sad0
Surprise0
Angry0
Happy0
Previous Article DA Wins Ward 96 In Tshwane, Gé Breytenbach Is New Ward Councillor
Next Article Ex-Collins Chabane Municipality Finance Chief Arrested Over VBS Loses

Stay Connected

FacebookLike
XFollow

Latest News

Catholic Church Experiences Surge in Membership Worldwide
Religion
April 4, 2026
Easter Weekend Drink-Driving: Joburg Traffic Cops Arrest 121 Tipsy Motorists
News
April 4, 2026
South African Christians Urged To Unite In Prayer For The Nation This Easter
Religion
April 4, 2026
Good Food, No Room Key Required: @Sandton Hotel’s Weekend Dining Experiences
Sponsored
April 4, 2026
//

The Bulrushes prides itself on real news you can trust. We keep everything simple – no fudging.

  • Company Profile
  • Contact Us
  • Privacy Policy
  • News
  • Politics
  • General
  • World
  • Athletics
  • Basketball
  • Boxing
  • Cricket
  • Football
  • Netball
  • Rugby
  • Swimming
  • Tennis
The BulrushesThe Bulrushes
Follow US
Copyright © 2026 The Bulrushes