The BulrushesThe Bulrushes
  • Home
  • News
    • General
    • Politics
    • World
  • APO Releases
  • Business
  • Sport
    • Athletics
    • Basketball
    • Boxing
    • Cricket
    • Football
    • Rugby
    • Netball
    • Swimming
    • Tennis
  • Entertainment
  • Bookmarks
Search
  • Crime
  • Health
  • Lifestyle
  • Science
  • Weird World
  • Company Profile
  • Contact Us
  • Privacy Policy
Copyright © 2026 The Bulrushes
Reading: Eskom Says Load-Shedding Eased From Stage 6
Share
Notification Show More
Font ResizerAa
The BulrushesThe Bulrushes
Font ResizerAa
Search
  • Home
  • SA National Elections 2024
  • News
    • General
    • Politics
    • World
  • Sport
    • Athletics
    • Basketball
    • Boxing
    • Cricket
    • Football
    • Netball
    • Rugby
    • Swimming
    • Tennis
  • Bookmarks
    • Customize Interests
    • My Bookmarks
  • The Bulrushes
    • Company Profile
    • Contact Us
    • Privacy Policy
Follow US
Copyright © 2026 The Bulrushes
The Bulrushes > News > Eskom Says Load-Shedding Eased From Stage 6
News

Eskom Says Load-Shedding Eased From Stage 6

Staff Writer
Staff Writer
Published: February 11, 2024
Share
2 Min Read
SHARE

Johannesburg – Eskom on Sunday said it has begun reducing load-shedding from the dreaded Stage 6.
The power utility said it reduced load-shedding to Stage 5 at midday on Sunday.

Earlier Electricity Minister Dr. Kgosientsho Ramokgopa said the high levels of load=shedding would be eased significantly by Wednesday, when generation units that were down were expected to be up and running.

He said the current Stage 6 load-shedding was a result of “calculated risks” undertaken by Eskom and his department.

Minister Ramokgopa explained that Eskom was prioritising planned maintenance to deliver long-term improvements to the grid.

Commenting on the matter the power utility said: “Over the past 48 hours, Eskom has successfully replenished its pumped storage dam levels and bringing back some generation units back to service,” the power utility said.

“This enabled the reduction of load-shedding to Stage 5 from midday until further notice.”

Eskom said it will closely monitor the power system and communicate any changes to load-shedding should it be required. 

The power utility said unplanned outages were at 17 595MW of generating capacity, while the capacity out of service for planned maintenance was at 6 885MW. 

“Eskom Power Station General Managers and their teams continue to work diligently to ensure that a total of 3 200MW is returned to service by Wednesday evening,” the power utility said. 

Eskom’ said its evening peak demand Sunday night was 25 290MW. 

“We would like to appeal to members of the public to use electricity sparingly and efficiently, including switching off geysers and pool pumps from 17:00 to 21:00,” Eskom said. 

“This lowers demand and helps in alleviating the pressure on the power system, contributing to lower stages of load-shedding.”

Support The Bulrushes PayPal Logo
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Email Copy Link
Share
What do you think?
Love0
Sad0
Surprise0
Angry0
Happy0
Previous Article WATCH: Electricity Minister Dr. Kgosientsho Ramokgopa ‘s Update On Load-Shedding
Next Article World Marathon Record Holder Kelvin Kiptum Dies In A Car Crash Along With His Coach

Stay Connected

FacebookLike
XFollow

Latest News

WATCH: Taxi Boss Bafana ‘King Of The Sky’ Sindane Too Ill To Appear At Madlanga Inquiry
Featured Video
September 23, 2026
Ed Sheeran’s Loop Tour Faces Chaos: Macklemore’s Removal Triggered Exodus
featured
September 23, 2026
Mpox Outbreak: Lab-Confirmed Cases Rise To 22, Renewed Calls For Vigilance
News
September 23, 2026
Air France And Extime Travel Unveil Paris Stopover
Travel
September 23, 2026
//

The Bulrushes prides itself on real news you can trust. We keep everything simple – no fudging.

  • Company Profile
  • Contact Us
  • Privacy Policy
  • News
  • Politics
  • General
  • World
  • Athletics
  • Basketball
  • Boxing
  • Cricket
  • Football
  • Netball
  • Rugby
  • Swimming
  • Tennis
The BulrushesThe Bulrushes
Follow US
Copyright © 2026 The Bulrushes