The BulrushesThe Bulrushes
  • Home
  • News
    • General
    • Politics
    • World
  • APO Releases
  • Business
  • Sport
    • Athletics
    • Basketball
    • Boxing
    • Cricket
    • Football
    • Rugby
    • Netball
    • Swimming
    • Tennis
  • Entertainment
  • Bookmarks
Search
  • Crime
  • Health
  • Lifestyle
  • Science
  • Weird World
  • Company Profile
  • Contact Us
  • Privacy Policy
Copyright © 2026 The Bulrushes
Reading: Fourth Night Of Stage 2 Load-Shedding, Eskom System Still Constrained
Share
Notification Show More
Font ResizerAa
The BulrushesThe Bulrushes
Font ResizerAa
Search
  • Home
  • SA National Elections 2024
  • News
    • General
    • Politics
    • World
  • Sport
    • Athletics
    • Basketball
    • Boxing
    • Cricket
    • Football
    • Netball
    • Rugby
    • Swimming
    • Tennis
  • Bookmarks
    • Customize Interests
    • My Bookmarks
  • The Bulrushes
    • Company Profile
    • Contact Us
    • Privacy Policy
Follow US
Copyright © 2026 The Bulrushes
The Bulrushes > Business > Fourth Night Of Stage 2 Load-Shedding, Eskom System Still Constrained
BusinessfeaturedNews

Fourth Night Of Stage 2 Load-Shedding, Eskom System Still Constrained

Staff Writer
Staff Writer
Published: May 12, 2022
Share
2 Min Read
SHARE

For the fourth day running Eskom is implementing Stage 2 load-shedding from 17:00 – 22:00 due to continued constraints on the power system.

“A shortage of generation capacity during the evening peak will require the implementation of Stage 2 load-shedding from 17:00 until 22:00 tonight,” said the struggling power utility on Thursday.

“Last night a generating unit at Lethabo Power Station was taken offline for repairs.

“One generation unit each at Kusile and Tutuka power stations were returned to service.”

Eskom said a generation unit at Matimba and another at Tutuka power stations are expected to return to service this afternoon.

“We currently have 2 379MW on planned maintenance, while another 15 365MW of capacity is unavailable due to breakdowns,” said Eskom.

“The onset of winter has seen increased demand and this will lead to capacity constraints throughout this period, particularly during the evening and morning peaks.

“Unfortunately, this would generally require the implementation of load-shedding during the evening peaks.”

Eskom reiterated its regular reminder to the public that load-shedding was implemented only as a last resort to protect the national grid.

“We, therefore, urge all South Africans to continue using electricity sparingly, especially between 05:00 – 09:00 in the mornings and 16:00 – 22:00 in the evenings,” said the power utility. 

Support The Bulrushes PayPal Logo
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Email Copy Link
Share
What do you think?
Love0
Sad0
Surprise0
Angry0
Happy0
Previous Article Man Run Over By Motorcycle In Durban Dies, Rider Critical, Airlifted
Next Article Traditional Healer In Court For Theft Of R103M From ABSA, Engineer Shot Dead

Stay Connected

FacebookLike
XFollow

Latest News

TikTok Star Wisba And Assistant Shot Dead At Soshanguve Scrapyard
News
November 19, 2026
Tropika Island Of Treasure: Caster Semenya And Ashay Sewlall Eliminated Again
Entertainment
November 19, 2026
Re-elected Cape Town Mayor Hill-Lewis Pledges To Keep Building SA’s ‘City Of Hope’
News
November 19, 2026
Cape Town’s Newest Summer-Night Tradition Switches On At Meerendal This December
Sponsored
November 19, 2026
//

The Bulrushes prides itself on real news you can trust. We keep everything simple – no fudging.

  • Company Profile
  • Contact Us
  • Privacy Policy
  • News
  • Politics
  • General
  • World
  • Athletics
  • Basketball
  • Boxing
  • Cricket
  • Football
  • Netball
  • Rugby
  • Swimming
  • Tennis
The BulrushesThe Bulrushes
Follow US
Copyright © 2026 The Bulrushes