Johannesburg – Eskom has ramped-up load-shedding to Stage 6 from Tuesday night.
In a power alert, Eskom said: “The implementation of load-shedding will be escalated to Stage 6 during the night, starting at 21H00 tonight until 05H00 on Wednesday morning.
“Stage 6 nightly load-shedding will then be implemented at 16H00 – 05H00 until further notice.”
The power utility added: “Seven units tripped today, of which three have returned to service. In addition, the return to service of three other units has been delayed. Unit 1 of Matla Power Station will be shut down tonight to repair a boiler tube leak”.


