Johannesburg – Eskom is implementing Stage 1 load-shedding from 05h00 Monday.
The power utility said Stage 1 will be implemented until 16h00.
“Thereafter, Stage 2 load-shedding will be then implemented from 16:00 throughout the night,” Eskom said in a power alert posted on Twitter.


