Johannesburg – Operations at the Grobler’s Bridge Port of Entry between South Africa and Botswana have resumed following the temporary suspension caused by severe flooding.
Announcing the resumption of operations on Thursday, (30 January 2025), the Commissioner of the Border Management Authority (BMA), Dr. Michael Masiapato said: “The port is now fully operational and ready to facilitate the movement of goods and people”.
The flooding, which resulted from inclement weather earlier in the month, necessitated the temporary suspension of services to allow for comprehensive safety assessments of the infrastructure and restoration of flooded facilities.
RELATED: Heavy Rains: BMA Suspends Grobler’s Bridge Port Operations – The Bulrushes
Dr. Masiapato commended the coordinated response of BMA, SARS, Groblerbridge Port Management officials, border stakeholders and the Botswana government.
“The safety of all port users remains our top priority. We appreciate the patience and cooperation of the public and transport operators during this challenging period,” said the BMA Commissioner.
“The swift restoration of operations demonstrates our commitment to ensuring minimal disruption to trade and travel.”
Operation HI -TIVISE – Report suspicious activities at ports of entry to 0801 229 019 – If you see something, say something.


